Please note that, Regardingregarding CTJ details in WS14 system, that we understand your response, Butbut we needrequire shop drawings for thisthese subjects (plan, section , framing elevation & Substructureand substructure arrangement for the Structuralstructural expansion joint details) in upcoming concourse level submissions.
NextThe next point, Regardingregarding CTJ details in WS25 system for Lessless than 50mm cavity, we are referring to concourse level wall cladding shop drawing submissions. For the 600mm cavity, please addedadd the CTJ details in upcoming concourse level shop drawing submissions for the review. Further, on the provided bulk head CTJ details provided, there is no material specification for the supports members &and fixing details. DrawingsThe drawings are incomplete. Please update the bulkhead details &and submit as a package tofor review (via Aconex) for thatto ensure the consistency of the drawings.

The text above was approved for publishing by the original author.

Previous       Next

무료로 시도해보기

메세지를 확인해 주세요
교정할 언어 선택

를 눌러서 이력서 교정하기.

eAngel.me

eAngel.me is a human proofreading service that enables you to correct your texts by live professionals in minutes.