CWC management currently uses thea job order costing system because each product, standard windows or custom windows, requires unique designsdesign. CostThe cost of products is determined by actual direct costs and overhead using a predetermined rate to the actual volume of the allocation base (normal costing). CWC allocates their overhead costs using the facility-wide rate, based on machine hours. Total costs for each product are accumulated using the job cost sheet. The product costs for each product fully absorb the manufacturing costs (absorption costing).
The text above was approved for publishing by the original author.
Previous
     
Next
받은편지함으로 가서 저희가 보낸 확인 링크를 눌러서 교정본을 받으세요. 더 많은 이메일을 교정받고 싶으시면:
또는