Developed electrical and instrumentation engineering design package, including electrical and instrument plot plans, electrical area classification drawings, lighting and grounding layout drawings, schematics, loop drawings, wiring diagrams, conduit and cable routing and instrument index.
Developed engineering design package, including bid package and performed project management from design phase to completion phase for a $ 2,000,000.00 project, consisted on installation of two HVAC units (2 Ton. Each) and new deck extension at GIP Delta platform. Concluded the project on time and budget. I was rewarded with a 17 % increase in my salary.
Coordinated work with E&I contractors and prepared cost estimates, quotes & timelines for materials and labor within Chevron’s purchasing and contractor safety procedures.
Ensure that EC&I construction contractors adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures, HSEQ and Site Instructions.
Diagnosed problems by interpreting and working from engineering drawings, blueprints, schematics, P&ID’s and equipment manufacturer’s literature.
Developed FEED and FEE package for GS Papa platform Heater control panel installation , including upgrade of 400 instrumentation loops. The initial project estimate was $ 600,000.00 and saved 25 % by reusing the existing control panel boxes.