At the beginning of February this year, on container vessel "Emma Maersk", there was a serious failure. VesselThe vessel with 13,537 containers was entering tothe Suez Canal, when tothe lower parts of the engine room started comingtaking on water. VesselThe vessel was lost its propulsion plant and was started drifteddrifting, due to flooding of the main engine. VesselThe vessel was transferedtransferred to Port Said by the tugstugs, which waswere called for help. During this failure the crew lifecrew's lives and cargo weren't threatened. UnderwaterThe underwater part of the hull was unsealed despite that thethe vessel had not beenbeing in a collision or in contact with the seabed before. Sea water was entering tothe vessel throughtthrough one of the aft bow thrusterthrusters and after was everaldamaged several rotor blades of the thruster, which also caused the channel to crack, where isthe mounted device is. EntryThe entry hole of the damaged thruster on Emma Maersk has been patched,; however, the vessel probably will be out of service.

The text above was approved for publishing by the original author.

Previous       Next

무료로 시도해보기

메세지를 확인해 주세요
교정할 언어 선택

를 지금 확인해보세요. Outlook 교정 플러그인!

eAngel.me

eAngel.me is a human proofreading service that enables you to correct your texts by live professionals in minutes.