Further, the land plans are prepared by superimposing the additional land requirement on the Village revenue maps independently, for the 6 locations (Covering(covering 9 villages), including 3 VUP, 2 Flyover junctions, and Toll plaza area and, enclosed together with schedules.
The text above was approved for publishing by the original author.
Previous
     
Next
받은편지함으로 가서 저희가 보낸 확인 링크를 눌러서 교정본을 받으세요. 더 많은 이메일을 교정받고 싶으시면:
또는