Problem 2 – Lack of standard methods of measurement
The tender drawings and specifications cannot cover every aspect of the concerns to all contractors. The process of estimation works involveby involving various assumptions. For example, right from the measurementmeasurements of quantities of works, preambles are made for the calculationcalculated works. The methods used in arriving at the final quantities can vary from one to another depending on the individual’s experience in the industry, level of expertise, etc.
Problem 3 – Timing of the tender
For example, there is no available quantity surveyorssurveyor to work on completing the tender documents until one week before the tendering deadline for submissions. In this case, the tender documents can barelyhardly be expected to be produced withto a very high quality and the insufficiency in time available to prepare and coordinatedcoordinate all the data can result in a higher chanceschance of incomplete bid documents and/or uncoordinated bid documents, which can further lead to misinterpretations in other areas of the tender works.
The text above was approved for publishing by the original author.
Previous
     
Next
받은편지함으로 가서 저희가 보낸 확인 링크를 눌러서 교정본을 받으세요. 더 많은 이메일을 교정받고 싶으시면:
또는