26.1.17
On-site: Zach kKeys, mMaeve kKeys and Stephen Keys ; start time 7:30 AM. w
We started to dig down for the shaft weand built two rings, wrapped with polish. Damon and plastic type the steel and poured 23 m of concrete.
The text above was approved for publishing by the original author.
Previous
     
Next
받은편지함으로 가서 저희가 보낸 확인 링크를 눌러서 교정본을 받으세요. 더 많은 이메일을 교정받고 싶으시면:
또는